IMPLEMENTATION

Start small. Validate the data. Then scale.

ClearRivet deployments are designed to be practical: understand the machine, configure the data path, commission it with your team, validate the production record and only then expand. Standard setup and commissioning are included.

WHY IT MATTERS

Commissioning is a data-accuracy gate, not a checkbox.

A dashboard is only useful when the underlying events are correct. ClearRivet commissioning should verify signal behaviour, count accuracy, downtime timing, unit conversion, machine identity and recovery after disconnects or restarts.

SCOPE

1. Confirm the machine

Identify the run signal, count source, target-rate logic, network constraints, production units and the views the customer needs.

COMMISSION

2. Connect and validate

Configure the machine connection, prove state changes and counts, check timing and compare ClearRivet against known production behaviour.

PROVE

3. Trial before rollout

Use the live system with real shifts, review data quality and operator workflow, then decide whether and how to scale.

IMPLEMENTATION INCLUDED

We stay with the setup until the standard connection is commissioned.

For Standard 24V and PLC Connected deployments, setup and commissioning are included. We work with your team to establish the connection, validate machine state and counts, and confirm the production record before the trial is treated as live.

Connection setupSignal/tag validationProduction-data acceptance
ClearRivet live shop-floor dashboard during machine commissioning
The 14-day software trial starts once ClearRivet is receiving the agreed live machine data.

CLEARRIVET APPROACH

Commissioning is a data-accuracy gate, not a checkbox.

A dashboard is only useful when the underlying events are correct. ClearRivet commissioning should verify signal behaviour, count accuracy, downtime timing, unit conversion, machine identity and recovery after disconnects or restarts.

Machine and site identity confirmed
Run/stop state validated
Count accuracy validated
Debounce/filtering checked where required
Production units and multipliers configured
Target-rate logic checked
Offline/reconnect behaviour tested
Customer acceptance before scale-up
See ClearRivet working

COMMON QUESTIONS

Questions manufacturing teams ask.

How long does implementation take?

Straightforward machines are designed for fast deployment, but final timing depends on signal access, networking, controller integration and site requirements.

Can configuration be prepared before arrival?

Yes. Where machine and site information is known, much of the configuration can be prepared in advance to reduce commissioning work.

Do you recommend rolling out every machine at once?

Usually no. Starting with a representative machine creates a safer proof point for data quality, workflow and business value.